{"id":1803,"date":"2016-09-28T10:10:31","date_gmt":"2016-09-28T03:10:31","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=1803"},"modified":"2019-06-13T10:12:27","modified_gmt":"2019-06-13T03:12:27","slug":"the-inauguration-ceremony-collection-system-and-wastewater-treatment-at-trung-vuong-emergency-hospital-capacity-is-1-500m3-day-night","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/the-inauguration-ceremony-collection-system-and-wastewater-treatment-at-trung-vuong-emergency-hospital-capacity-is-1-500m3-day-night\/","title":{"rendered":"The inauguration ceremony  Collection system and wastewater treatment at Trung Vuong Emergency Hospital \u2013 capacity is 1.500m3\/day.night"},"content":{"rendered":"<p>Morning October 28nd, 2013, the inauguration ceremony Collection system and wastewater treatment at Trung Vuong Emergency Hospital was held between Duong Nhat Investment Construction and Environmental Technology Co., Ltd. and Trung Vuong Emergency Hospital at 266 Ly Thuong Kiet Street, 14 Ward, district 10, HCMC.<\/p>\n<p>&nbsp;<\/p>\n<p>All of wastewater fro, the department, room, canteen ,\u2026 are collected thorough transfer to treatment plant, the water standards is QCVN 28:2010\/BTNMT, value C, Column A.<\/p>\n<p>&nbsp;<\/p>\n<p>Duong Nhat Company was awarded certificates so implementation schedule and project quality.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-1166 size-full\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/BenhVienTrungVuong.jpg\" alt=\"BenhVienTrungVuong\" width=\"550\" height=\"413\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/BenhVienTrungVuong.jpg 550w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/BenhVienTrungVuong-500x375.jpg 500w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Morning October 28nd, 2013, the inauguration ceremony Collection system and wastewater treatment at Trung Vuong Emergency Hospital was held between Duong Nhat Investment Construction and Environmental Technology Co., Ltd. and Trung Vuong Emergency Hospital at 266 Ly Thuong Kiet Street, 14 Ward, district 10, HCMC. &nbsp; All of wastewater fro, the department, room, canteen ,\u2026 &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1166,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1803"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=1803"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1803\/revisions"}],"predecessor-version":[{"id":1804,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1803\/revisions\/1804"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1166"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=1803"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=1803"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=1803"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}