{"id":1807,"date":"2016-09-29T10:18:26","date_gmt":"2016-09-29T03:18:26","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=1807"},"modified":"2019-06-13T10:22:44","modified_gmt":"2019-06-13T03:22:44","slug":"handover-ceremony-for-turnkey-project-waster-treatment-system-for-linh-trung-1-export-processing-zone","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/handover-ceremony-for-turnkey-project-waster-treatment-system-for-linh-trung-1-export-processing-zone\/","title":{"rendered":"Handover Ceremony for Turnkey Project: Waster treatment system for Linh Trung 1 Export Processing zone"},"content":{"rendered":"<p>November 12th , 2013, The handover Ceremony Waster treatment system for Linh Trung 1 Export Processing zone is held between Duong Nhat investment construction \u00e1n environmental technology company and Sepzone Linh Trung (Viet Nam). Total capacity is 7.000m3\/day, capacity of phase 3: 2000m3\/day. Achieved outflow is QCVN: 40:2011\/BTNMT, column A.<\/p>\n<p>&nbsp;<\/p>\n<p>This project was implemented with Turnkey Project: Designing, supplying, equipment installation, execute the construction, operation instruction and hand over technology.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-1808 size-full\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/LinhTrung21.jpg\" alt=\"LinhTrung21\" width=\"601\" height=\"451\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/LinhTrung21.jpg 601w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/LinhTrung21-500x375.jpg 500w\" sizes=\"(max-width: 601px) 100vw, 601px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>November 12th , 2013, The handover Ceremony Waster treatment system for Linh Trung 1 Export Processing zone is held between Duong Nhat investment construction \u00e1n environmental technology company and Sepzone Linh Trung (Viet Nam). Total capacity is 7.000m3\/day, capacity of phase 3: 2000m3\/day. Achieved outflow is QCVN: 40:2011\/BTNMT, column A. &nbsp; This project was implemented &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1808,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1807"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=1807"}],"version-history":[{"count":2,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1807\/revisions"}],"predecessor-version":[{"id":1811,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1807\/revisions\/1811"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1808"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=1807"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=1807"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=1807"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}