{"id":1812,"date":"2016-11-30T10:23:39","date_gmt":"2016-11-30T03:23:39","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=1812"},"modified":"2019-06-13T10:26:31","modified_gmt":"2019-06-13T03:26:31","slug":"duong-nhat-won-the-epc-project-design-build-sewage-treatment-plant-2-phase-2-with-additional-capacity-of-5000-cmd-at-vietnam-singapore-industrial-park-ii-vsip-ii-in-b","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/duong-nhat-won-the-epc-project-design-build-sewage-treatment-plant-2-phase-2-with-additional-capacity-of-5000-cmd-at-vietnam-singapore-industrial-park-ii-vsip-ii-in-b\/","title":{"rendered":"DUONG NHAT won the \u201cEPC project: \u201cDesign &#038; Build Sewage Treatment Plant 2 \u2013 Phase 2 with Additional capacity of 5,000 CMD at Vietnam Singapore Industrial Park II (VSIP II) in Binh Duong Province\u201d"},"content":{"rendered":"<p>On Mid-November, DUONG NHAT was being chosen by Viet Nam &#8211; Singapore Industrial Park J.V Co., Ltd (VSIP) as EPC contractor for project: \u201cDesign &amp; Build Sewage Treatment Plant 2 \u2013 Phase 2 with Additional capacity of 5,000 CMD at Vietnam Singapore Industrial Park II (VSIP II) in Binh Duong Province\u201d.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-1813 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/VSipII.jpg\" alt=\"VSipII\" width=\"640\" height=\"320\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/VSipII.jpg 640w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/VSipII-500x250.jpg 500w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>Treated wastewater will reach the QCVN 40:2011\/BTNMT before being discharged into a receiving source.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On Mid-November, DUONG NHAT was being chosen by Viet Nam &#8211; Singapore Industrial Park J.V Co., Ltd (VSIP) as EPC contractor for project: \u201cDesign &amp; Build Sewage Treatment Plant 2 \u2013 Phase 2 with Additional capacity of 5,000 CMD at Vietnam Singapore Industrial Park II (VSIP II) in Binh Duong Province\u201d. &nbsp; &nbsp; Treated wastewater &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1813,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1812"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=1812"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1812\/revisions"}],"predecessor-version":[{"id":1815,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1812\/revisions\/1815"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1813"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=1812"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=1812"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=1812"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}