{"id":1816,"date":"2016-11-30T10:27:04","date_gmt":"2016-11-30T03:27:04","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=1816"},"modified":"2019-06-13T10:29:35","modified_gmt":"2019-06-13T03:29:35","slug":"duong-nhat-signed-the-project-build-supply-and-install-equipment-of-the-collection-system-and-wastwater-treatment-plant-200-m3-day-of-project-quang-trung-waste-treatment","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/duong-nhat-signed-the-project-build-supply-and-install-equipment-of-the-collection-system-and-wastwater-treatment-plant-200-m3-day-of-project-quang-trung-waste-treatment\/","title":{"rendered":"DUONG NHAT signed the project: \u201cBuild, Supply and Install Equipment of the Collection system and Wastwater treatment plant, 200 m3\/day\u201d of project \u201cQuang Trung Waste treatment area, Dong Nai province\u201d"},"content":{"rendered":"<p>On Mid-November, DUONG NHAT and Sonadezi Services Joint-Stock Company signed the contract \u201cWastewater collection system and Wastewater treatment plant, 200m3\/day of Quang Trung Waste Treatment Area in Dong Nai province\u201d.<\/p>\n<p>&nbsp;<\/p>\n<p>Response to accelerate to implement the project, on November 16th 2016, DUONG NHAT held a commencement ceremony with the participation of representative of Sonadezi and Duong Nhat.<\/p>\n<p>&nbsp;<\/p>\n<p>Treated wastewater will reach QCVN 40:2011\/BTNMT before being discharged into a receiving source.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-1492 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/11.Sonadezi.jpg\" alt=\"Sonadezi\" width=\"400\" height=\"250\" \/><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On Mid-November, DUONG NHAT and Sonadezi Services Joint-Stock Company signed the contract \u201cWastewater collection system and Wastewater treatment plant, 200m3\/day of Quang Trung Waste Treatment Area in Dong Nai province\u201d. &nbsp; Response to accelerate to implement the project, on November 16th 2016, DUONG NHAT held a commencement ceremony with the participation of representative of Sonadezi &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1492,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1816"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=1816"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1816\/revisions"}],"predecessor-version":[{"id":1817,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1816\/revisions\/1817"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1492"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=1816"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=1816"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=1816"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}