{"id":1829,"date":"2019-01-04T10:58:06","date_gmt":"2019-01-04T03:58:06","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=1829"},"modified":"2019-06-13T11:01:27","modified_gmt":"2019-06-13T04:01:27","slug":"duong-nhat-signed-the-pc-contract-of-package-wastewater-treatment-plant-for-concentrated-seafood-processing-zones-at-loc-an-commune-dat-do-district-ba-ria-vung-tau-province","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/duong-nhat-signed-the-pc-contract-of-package-wastewater-treatment-plant-for-concentrated-seafood-processing-zones-at-loc-an-commune-dat-do-district-ba-ria-vung-tau-province\/","title":{"rendered":"DUONG NHAT signed the PC contract of Package: \u201cWastewater treatment plant for Concentrated Seafood Processing Zones at Loc An commune, Dat Do district, Ba Ria \u2013 Vung Tau Province\u201d"},"content":{"rendered":"<p>Date 29th March, 2018, Duong Nhat signed the PC contract of package \u201cWastewater treatment plant for Concentrated seafood processing zones at Loc An commune, Dat Do District, Ba Ria \u2013 Vung Tau province\u201d with the owner: Dat Do District Project Management Unit of Construction Investment. Quality of Effluent meets to QCVN 01-MT:2015\/BTNMT (Kq = 0,9; Kf= 0,9), capacity: 6.000 m3\/day.<\/p>\n<p>&nbsp;<\/p>\n<p>The project performed at Loc An Commune, Dat Do District, Ba Ria \u2013 Vung Tau province.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-1568 size-full\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/LocAn1.jpg\" alt=\"LocAn\" width=\"1200\" height=\"849\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/LocAn1.jpg 1200w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/LocAn1-500x354.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/LocAn1-768x543.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/LocAn1-1024x724.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Date 29th March, 2018, Duong Nhat signed the PC contract of package \u201cWastewater treatment plant for Concentrated seafood processing zones at Loc An commune, Dat Do District, Ba Ria \u2013 Vung Tau province\u201d with the owner: Dat Do District Project Management Unit of Construction Investment. Quality of Effluent meets to QCVN 01-MT:2015\/BTNMT (Kq = 0,9; &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1568,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1829"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=1829"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1829\/revisions"}],"predecessor-version":[{"id":1830,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1829\/revisions\/1830"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1568"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=1829"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=1829"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=1829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}