{"id":1845,"date":"2019-01-10T11:26:22","date_gmt":"2019-01-10T04:26:22","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=1845"},"modified":"2019-06-13T11:33:49","modified_gmt":"2019-06-13T04:33:49","slug":"duong-nhat-sucessfully-signed-an-epc-contract-of-project-wastewater-treatment-plant-2-phase-3-stp-2-phase-2-at-vsip-ii-industrial-park-in-binh-duong","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/duong-nhat-sucessfully-signed-an-epc-contract-of-project-wastewater-treatment-plant-2-phase-3-stp-2-phase-2-at-vsip-ii-industrial-park-in-binh-duong\/","title":{"rendered":"Duong Nhat sucessfully signed an EPC contract of project: Wastewater treatment plant 2, phase 3 (STP 2-Phase 2) at VSIP II Industrial Park in Binh Duong"},"content":{"rendered":"<p>Date 30th November, 2016, Duong Nhat in coordination with Viet Nam \u2013 Singapore Industrial Park K.V., Co., Ltd (VSIP) officially signed the the EPC project \u201cWastewater treatment plant 2, phase 2 (STP2 \u2013 Phase 2) at VSIP II Industrial Parkt in Binh Duong\u201d. The quality of effluent achieves QCVN 40:2011\/BTNMT column A.<\/p>\n<p>The project was performed at VSIP II Industrial Park, Binh Duong province.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-1846 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/VSipII11.jpg\" alt=\"VSipII11\" width=\"974\" height=\"688\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/VSipII11.jpg 974w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/VSipII11-500x353.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/VSipII11-768x542.jpg 768w\" sizes=\"(max-width: 974px) 100vw, 974px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Date 30th November, 2016, Duong Nhat in coordination with Viet Nam \u2013 Singapore Industrial Park K.V., Co., Ltd (VSIP) officially signed the the EPC project \u201cWastewater treatment plant 2, phase 2 (STP2 \u2013 Phase 2) at VSIP II Industrial Parkt in Binh Duong\u201d. The quality of effluent achieves QCVN 40:2011\/BTNMT column A. The project was &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1846,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1845"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=1845"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1845\/revisions"}],"predecessor-version":[{"id":1848,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1845\/revisions\/1848"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1846"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=1845"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=1845"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=1845"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}