{"id":1855,"date":"2019-01-21T11:45:57","date_gmt":"2019-01-21T04:45:57","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=1855"},"modified":"2019-06-13T11:48:25","modified_gmt":"2019-06-13T04:48:25","slug":"duong-nhat-signed-the-turnkey-contract-of-package-wastewater-treatment-plant-of-tan-hung-rubber-processing-factory-of-project-tan-hung-rubber-processing-factory-in","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/duong-nhat-signed-the-turnkey-contract-of-package-wastewater-treatment-plant-of-tan-hung-rubber-processing-factory-of-project-tan-hung-rubber-processing-factory-in\/","title":{"rendered":"DUONG NHAT signed the Turnkey contract of Package: \u201cWastewater treatment plant of Tan Hung Rubber processing factory\u201d of project \u201cTan Hung Rubber processing factory\u201d in Binh Phuoc"},"content":{"rendered":"<p>Date 24th October, 2017, Duong Nhat signed the Turnkey contract of Package: Wastewater treatment plant of Tan Hung Rubber processing factory\u201d of project \u201cTan Hung Rubber processing factory, capacity 250 m3\/day with owner Dong Phu Rubber Joint Stock Company (DORUCO &#8211; VRG). The Quality of Effluent meets to QCVN 01-MT:2015\/BTNMT.<\/p>\n<p>The project performed at Thuan Phu Commune, Dong Phu District, Binh Phuoc.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-1534 size-full\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CaoSuTanHung1.jpg\" alt=\"CaoSuTanHung\" width=\"1200\" height=\"896\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CaoSuTanHung1.jpg 1200w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CaoSuTanHung1-500x373.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CaoSuTanHung1-768x573.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CaoSuTanHung1-1024x765.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Date 24th October, 2017, Duong Nhat signed the Turnkey contract of Package: Wastewater treatment plant of Tan Hung Rubber processing factory\u201d of project \u201cTan Hung Rubber processing factory, capacity 250 m3\/day with owner Dong Phu Rubber Joint Stock Company (DORUCO &#8211; VRG). The Quality of Effluent meets to QCVN 01-MT:2015\/BTNMT. The project performed at Thuan &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1534,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1855"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=1855"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1855\/revisions"}],"predecessor-version":[{"id":1856,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1855\/revisions\/1856"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1534"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=1855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=1855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=1855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}