{"id":1889,"date":"2019-02-01T14:17:00","date_gmt":"2019-02-01T07:17:00","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=1889"},"modified":"2019-06-13T14:18:47","modified_gmt":"2019-06-13T07:18:47","slug":"duong-nhat-signed-an-epc-contract-of-project-wastewater-treatment-plant-of-ear-nose-throat-hospital-hcmc-in-hcmc","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/duong-nhat-signed-an-epc-contract-of-project-wastewater-treatment-plant-of-ear-nose-throat-hospital-hcmc-in-hcmc\/","title":{"rendered":"Duong Nhat signed an EPC Contract of Project \u201cWastewater treatment plant of Ear Nose Throat Hospital HCMc\u201d in HCMc"},"content":{"rendered":"<p>Date 20<sup>th<\/sup> August, 2018, Duong Nhat signed an EPC contract of project: Wastewater treatment plant of Ear Nose Throat Hospital HCMc, capacity 250 m<sup>3<\/sup>\/day.<\/p>\n<p>Established in 1986, Ho Chi Minh City ENT Hospital is the leading general hospital for Ear Nose Throat in Ho Chi Minh City.Along with the developments, improving the quality of medical treatment and expanding the facilities, the attention to waste water treatment is also the top priority. The implementation of the project &#8220;Waste water treatment system for Ear Nose Throat Hospital Ho Chi Minh City&#8221; is also included in the plan.<\/p>\n<p>The standard applied of effluent: QCVN 28:2010\/BTNMT.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-1585 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2018\/08\/BenhVienTaiMuiHong1.jpg\" alt=\"\" width=\"360\" height=\"360\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2018\/08\/BenhVienTaiMuiHong1.jpg 360w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2018\/08\/BenhVienTaiMuiHong1-150x150.jpg 150w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2018\/08\/BenhVienTaiMuiHong1-100x100.jpg 100w\" sizes=\"(max-width: 360px) 100vw, 360px\" \/><\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Date 20th August, 2018, Duong Nhat signed an EPC contract of project: Wastewater treatment plant of Ear Nose Throat Hospital HCMc, capacity 250 m3\/day. Established in 1986, Ho Chi Minh City ENT Hospital is the leading general hospital for Ear Nose Throat in Ho Chi Minh City.Along with the developments, improving the quality of medical &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1585,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1889"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=1889"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1889\/revisions"}],"predecessor-version":[{"id":1890,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/1889\/revisions\/1890"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1585"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=1889"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=1889"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=1889"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}