{"id":2771,"date":"2015-09-28T14:51:51","date_gmt":"2015-09-28T07:51:51","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2771"},"modified":"2019-06-25T14:53:54","modified_gmt":"2019-06-25T07:53:54","slug":"commencement-ceremony-of-epc-turnkey-project-construction-of-centralized-wastewater-treatment-plant-for-tan-binh-industrial-park-phase-1-capacity-2-500m3-day","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/commencement-ceremony-of-epc-turnkey-project-construction-of-centralized-wastewater-treatment-plant-for-tan-binh-industrial-park-phase-1-capacity-2-500m3-day\/","title":{"rendered":"Commencement Ceremony of EPC (Turnkey) project: Construction of centralized wastewater treatment plant for Tan Binh Industrial Park, phase 1 \u2013 capacity: 2.500m3\/day"},"content":{"rendered":"<p>On September 25th 2015, Tan Binh Industrial Park Joint Stock Company (TBIP) and Duong Nhat Construction Investment and Environmental Technology Company Ltd., officially hold the commencement ceremony for EPC (Turnkey) project: Construction of centralized wastewater treatment plant for Tan Binh Industrial Park, phase 1 \u2013 capacity: 2.500m3\/day at Tan Binh commune, Bac Tan Uyen District, Binh Duong Province. It is expected to be finished within 355 days from the commencement day.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-1417 size-full\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/KCNTanBinhGD1.jpg\" alt=\"KCN Tan Binh GD1\" width=\"1156\" height=\"768\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/KCNTanBinhGD1.jpg 1156w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/KCNTanBinhGD1-500x332.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/KCNTanBinhGD1-768x510.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/KCNTanBinhGD1-1024x680.jpg 1024w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/KCNTanBinhGD1-600x399.jpg 600w\" sizes=\"(max-width: 1156px) 100vw, 1156px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On September 25th 2015, Tan Binh Industrial Park Joint Stock Company (TBIP) and Duong Nhat Construction Investment and Environmental Technology Company Ltd., officially hold the commencement ceremony for EPC (Turnkey) project: Construction of centralized wastewater treatment plant for Tan Binh Industrial Park, phase 1 \u2013 capacity: 2.500m3\/day at Tan Binh commune, Bac Tan Uyen District, &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1417,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2771"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2771"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2771\/revisions"}],"predecessor-version":[{"id":2772,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2771\/revisions\/2772"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1417"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2771"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2771"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2771"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}