{"id":2785,"date":"2014-09-10T15:15:15","date_gmt":"2014-09-10T08:15:15","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2785"},"modified":"2019-06-25T15:17:39","modified_gmt":"2019-06-25T08:17:39","slug":"taking-over-and-handing-over-and-put-into-use-the-wastewater-treatment-system-of-textile-and-garment-company-7","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/taking-over-and-handing-over-and-put-into-use-the-wastewater-treatment-system-of-textile-and-garment-company-7\/","title":{"rendered":"Taking over and handing over and put into use the wastewater treatment system of Textile and Garment Company 7"},"content":{"rendered":"<p>(Duong Nhat) on 12\/15\/2012 Textile and Garment Company 7 (military zone No.7) and Duong Nhat Investment Construction and Environmental Technology Co., Ltd had held the ceremony for taking over, handing over and put into use the wastewater treatment plant with capacity Q = 1200 m3\/da, outflow achieved class A of QCVN 24:2009\/BTNMT.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-2380 size-full\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/10\/DetMay7New.jpg\" alt=\"Det May 7\" width=\"1200\" height=\"900\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/10\/DetMay7New.jpg 1200w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/10\/DetMay7New-500x375.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/10\/DetMay7New-768x576.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/10\/DetMay7New-1024x768.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Duong Nhat) on 12\/15\/2012 Textile and Garment Company 7 (military zone No.7) and Duong Nhat Investment Construction and Environmental Technology Co., Ltd had held the ceremony for taking over, handing over and put into use the wastewater treatment plant with capacity Q = 1200 m3\/da, outflow achieved class A of QCVN 24:2009\/BTNMT. &nbsp; &nbsp; DUONG &#8230;<\/p>\n","protected":false},"author":4,"featured_media":2380,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2785"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2785"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2785\/revisions"}],"predecessor-version":[{"id":2786,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2785\/revisions\/2786"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/2380"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2785"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2785"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}