{"id":2813,"date":"2014-09-11T09:26:56","date_gmt":"2014-09-11T02:26:56","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2813"},"modified":"2019-06-26T09:33:32","modified_gmt":"2019-06-26T02:33:32","slug":"commencement-ceremony-of-the-work-upgrading-and-renovation-of-wastewater-treatment-system-engineering-enterprise-processing-factory-of-tay-ninh-rubber-joint-stock-company","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/commencement-ceremony-of-the-work-upgrading-and-renovation-of-wastewater-treatment-system-engineering-enterprise-processing-factory-of-tay-ninh-rubber-joint-stock-company\/","title":{"rendered":"Commencement ceremony of the work: \u201cUpgrading and renovation of wastewater treatment system engineering enterprise processing factory\u201d of Tay Ninh Rubber Joint Stock Company"},"content":{"rendered":"<p>(Duong Nhat) On 15th August 2012 in the morning, in Hiep Thanh ward, Go Dau district, Tay Ninh province had held commencement ceremony of the work &#8220;Upgrading and renovation of wastewater treatment systems Engineering Enterprise Processing Factory &#8221; under Tay Ninh Rubber joint stock company, the maximum treatment capacity is 1700 m3\/day. The quality of effluent after treatment achieved column A QCVN 01: 2008\/BTNMT, the criteria remaining achieved column A QCVN 40: 2011\/BTNMT.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-1141 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CaoSuTayNinh.jpg\" alt=\"Cao Su Tay Ninh\" width=\"550\" height=\"419\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CaoSuTayNinh.jpg 550w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CaoSuTayNinh-500x381.jpg 500w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><em>Mr. Le Van Chanh &#8211; General Director of Tay Ninh Rubber JSC started command given to the Director of Duong Nhat Ccompany \u2013 Mr. Hoang Ngoc Tung.<\/em><\/p>\n<p>&nbsp;<\/p>\n<p>Commencement ceremony held by the EPC contractor (Duong Nhat Investment Construction and Environmental Technology Co., Ltd) and Employer (Tay Ninh Rubber Joint Stock Company) held which was attended by representatives of Viet Nam Rubber Industry Group, representative of Employer Tay Ninh Rubber Joint Stock Company with representatives of companies, farms, factories, and representatives of local government.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-1143 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CaoSuTayNinh2.jpg\" alt=\"Cao Su Tay Ninh\" width=\"550\" height=\"367\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CaoSuTayNinh2.jpg 550w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CaoSuTayNinh2-500x334.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CaoSuTayNinh2-300x200.jpg 300w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><em>Mr.Hoang Ngoc Tung &#8211; Director of Duong Nhat Company with representative of Rubber Group and Board of Director Tay Ninh Rubber Joint Stock Company started construction ground.<\/em><\/p>\n<p>&nbsp;<\/p>\n<p>Contractors Duong Nhat Investment Construction and Environmental Technology Co., Ltd will implement and complete construction drawings design; execution, construction and equipment installation, operation guidance, technology transfer and handover the Works and put in to use within 233 days from commencement date with turnkey performance.<\/p>\n<p>&nbsp;<\/p>\n<p>Wastewater after treatment will be discharged directly to the Vam Co Dong River. Therefore, the Duong Nhat company has researched and application of new technologies, modern, safety and low operating costs in order to minimize pollution levels, ensure wastewater after treatment achieved column A QCVN 01: 2008\/BTNMT, the criteria being achieved column A QCVN 40: 2011\/BTNMT before discharge.<\/p>\n<p>&nbsp;<\/p>\n<p>Tay Ninh Television, Vietnam Rubber-Newspaper, Agency of Vietnam Rubber Industry Group, Tay Ninh Newspaper had coverage of Commencement ceremony for this work.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Duong Nhat) On 15th August 2012 in the morning, in Hiep Thanh ward, Go Dau district, Tay Ninh province had held commencement ceremony of the work &#8220;Upgrading and renovation of wastewater treatment systems Engineering Enterprise Processing Factory &#8221; under Tay Ninh Rubber joint stock company, the maximum treatment capacity is 1700 m3\/day. The quality of &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1143,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2813"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2813"}],"version-history":[{"count":2,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2813\/revisions"}],"predecessor-version":[{"id":2815,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2813\/revisions\/2815"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1143"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2813"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}