{"id":2842,"date":"2015-04-02T10:18:48","date_gmt":"2015-04-02T03:18:48","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2842"},"modified":"2019-06-26T10:21:05","modified_gmt":"2019-06-26T03:21:05","slug":"handover-and-inauguration-ceremony-of-waste-water-treatment-plant-for-c-p-hue-schrimp-factory-with-capacity-of-1-300m3-day","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/handover-and-inauguration-ceremony-of-waste-water-treatment-plant-for-c-p-hue-schrimp-factory-with-capacity-of-1-300m3-day\/","title":{"rendered":"Handover and Inauguration ceremony of Waste water treatment plant for C.P Hue Schrimp factory with capacity of 1.300m3\/day"},"content":{"rendered":"<p>(Duong Nhat) On 11th Jan, 2014, the handover and inauguration ceremony was held with the participation of representatives of investor C.P Vietnam Corporation and contractor DUONG NHAT to accept and handover to operate the wastewater treatment plant for C.P Hue Schrimp factory.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-1226 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CPHue2.jpg\" alt=\"CP Hue\" width=\"800\" height=\"565\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CPHue2.jpg 800w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CPHue2-500x353.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CPHue2-768x542.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CPHue2-600x424.jpg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>The WWTP was built on the site of C.P Hue Factory in lot A01-A12, Section A, Phong Dien Industrial Park, Phong Dien District, Thua Thien Hue. After operation, this plant ensures that treated wastewater meets to QCVN 11:2008\/BTNMT and QCVN 40:2011\/BTNMT column A.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Duong Nhat) On 11th Jan, 2014, the handover and inauguration ceremony was held with the participation of representatives of investor C.P Vietnam Corporation and contractor DUONG NHAT to accept and handover to operate the wastewater treatment plant for C.P Hue Schrimp factory. &nbsp; &nbsp; The WWTP was built on the site of C.P Hue Factory &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1226,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2842"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2842"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2842\/revisions"}],"predecessor-version":[{"id":2843,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2842\/revisions\/2843"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1226"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}