{"id":2844,"date":"2015-04-02T10:21:50","date_gmt":"2015-04-02T03:21:50","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2844"},"modified":"2019-06-26T10:23:46","modified_gmt":"2019-06-26T03:23:46","slug":"duong-nhat-awarded-a-package-wastewater-treatment-system-capacity-2-000-m3-day-for-coca-cola-plant-in-ha-noi-under-coca-cola-corporation","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/duong-nhat-awarded-a-package-wastewater-treatment-system-capacity-2-000-m3-day-for-coca-cola-plant-in-ha-noi-under-coca-cola-corporation\/","title":{"rendered":"DUONG NHAT awarded a package: Wastewater treatment system, capacity 2.000 m3\/day for Coca \u2013 Cola plant in Ha Noi under Coca \u2013 Cola Corporation"},"content":{"rendered":"<p>(Duong Nhat) On 12th Feb, 2014, DUONG NHAT signed the Letter of intent (LOI) to supply materials, equipment, construction and installation of wastewater treatment system, capacity 2.000 m3\/day of project: Upgrading wastewater treatment system of Coca \u2013 Cola Ha Noi plant with Coca \u2013 Cola VietNam Beverages Limited (under Coca \u2013 Cola Beverages Corporation).<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-2627 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CocaColaHaNoiNew.jpg\" alt=\"Coca Cola Ha Noi\" width=\"900\" height=\"636\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CocaColaHaNoiNew.jpg 900w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CocaColaHaNoiNew-500x353.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/CocaColaHaNoiNew-768x543.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>Treated wastewater will reach Standard QCVN 40:2011\/BTNMT and Standard ES-RQ 225 of Coca \u2013 Cola Beverages before discharged to receiving water.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Duong Nhat) On 12th Feb, 2014, DUONG NHAT signed the Letter of intent (LOI) to supply materials, equipment, construction and installation of wastewater treatment system, capacity 2.000 m3\/day of project: Upgrading wastewater treatment system of Coca \u2013 Cola Ha Noi plant with Coca \u2013 Cola VietNam Beverages Limited (under Coca \u2013 Cola Beverages Corporation). &nbsp; &#8230;<\/p>\n","protected":false},"author":4,"featured_media":2627,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2844"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2844"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2844\/revisions"}],"predecessor-version":[{"id":2845,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2844\/revisions\/2845"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/2627"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2844"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2844"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2844"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}