{"id":2850,"date":"2015-04-02T10:28:19","date_gmt":"2015-04-02T03:28:19","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2850"},"modified":"2019-06-26T10:33:36","modified_gmt":"2019-06-26T03:33:36","slug":"commencement-ceremony-of-project-nhon-trach-5-centralized-wastewater-treatment-plant-phase-2nd","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/commencement-ceremony-of-project-nhon-trach-5-centralized-wastewater-treatment-plant-phase-2nd\/","title":{"rendered":"Commencement ceremony of project Nhon Trach 5 &#8211; centralized wastewater treatment plant, phase 2nd"},"content":{"rendered":"<p>(Duong Nhat) On 21st Feb, 2014, the commencement ceremony was held with the participation of representatives of investor and EPC contractor DUONG NHAT to accept and handover to operate the Nhon Trach 5- centralized wastewater treatment plant.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-2853 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/NhonTrach541.jpg\" alt=\"Nhon Trach 5\" width=\"800\" height=\"600\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/NhonTrach541.jpg 800w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/NhonTrach541-500x375.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/NhonTrach541-768x576.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>DUONG NHAT are carrying out the Nhon Trach 5 centralized wastewater treatment plant, phase 2nd with capacity 2.000 m3\/day with the scope of works: construction, equipment supply and installation, operation training, technical transfer and ensure that treated wastewater will meet to QCVN 40:2011\/BTNMT column A.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Duong Nhat) On 21st Feb, 2014, the commencement ceremony was held with the participation of representatives of investor and EPC contractor DUONG NHAT to accept and handover to operate the Nhon Trach 5- centralized wastewater treatment plant. &nbsp; &nbsp; DUONG NHAT are carrying out the Nhon Trach 5 centralized wastewater treatment plant, phase 2nd with &#8230;<\/p>\n","protected":false},"author":4,"featured_media":2851,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2850"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2850"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2850\/revisions"}],"predecessor-version":[{"id":2855,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2850\/revisions\/2855"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/2851"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2850"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2850"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2850"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}