{"id":2861,"date":"2015-04-02T10:39:20","date_gmt":"2015-04-02T03:39:20","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2861"},"modified":"2019-06-26T10:41:56","modified_gmt":"2019-06-26T03:41:56","slug":"inauguration-ceremony-of-project-wastewater-treatment-plant-of-gia-dinh-peoples-hospital-with-capacity-of-1-200-m3-day","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/inauguration-ceremony-of-project-wastewater-treatment-plant-of-gia-dinh-peoples-hospital-with-capacity-of-1-200-m3-day\/","title":{"rendered":"Inauguration ceremony of project: Wastewater treatment plant of Gia Dinh People\u2019s Hospital with capacity of 1.200 m3\/day"},"content":{"rendered":"<p>(Duong Nhat) On 5th June, 2014, the Gia Dinh People\u2019s Hospital in coordination with DUONG NHAT hosted Inauguration ceremony of wastewater treatment plant of Gia Dinh People\u2019s Hospital with capacity of 1.200m3\/day at No. 1, No Trang Long Street, ward 7, Binh Thanh district. After operation, the plant ensures all wastewater generated by the hospital was treated prior to discharged to the city sewer system. The scope of works that implemented by DUONG NHAT included: construction, equipment supply and installation. DUONG NHAT carried out this project complied with submitted work schedules and qualities.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-2539 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/11\/BenhVienGiaDinh.jpg\" alt=\"Benh Vien Gia Dinh\" width=\"620\" height=\"337\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/11\/BenhVienGiaDinh.jpg 620w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/11\/BenhVienGiaDinh-500x272.jpg 500w\" sizes=\"(max-width: 620px) 100vw, 620px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>Before doing this package, DUONG NHAT had the successful implementation variety of similar wastewater treatment projects for hospital such as: Trung Vuong Emergengy hospital, Cu Chi General hospital, Binh Duong General Hospital and some hopitals in Dong Thap province.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Duong Nhat) On 5th June, 2014, the Gia Dinh People\u2019s Hospital in coordination with DUONG NHAT hosted Inauguration ceremony of wastewater treatment plant of Gia Dinh People\u2019s Hospital with capacity of 1.200m3\/day at No. 1, No Trang Long Street, ward 7, Binh Thanh district. After operation, the plant ensures all wastewater generated by the hospital &#8230;<\/p>\n","protected":false},"author":4,"featured_media":2539,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2861"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2861"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2861\/revisions"}],"predecessor-version":[{"id":2862,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2861\/revisions\/2862"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/2539"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}