{"id":2874,"date":"2015-04-02T10:58:27","date_gmt":"2015-04-02T03:58:27","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2874"},"modified":"2019-06-26T11:05:01","modified_gmt":"2019-06-26T04:05:01","slug":"hand-over-and-inauguration-ceremony-of-phuoc-dong-supply-water-treatment-plant","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/hand-over-and-inauguration-ceremony-of-phuoc-dong-supply-water-treatment-plant\/","title":{"rendered":"Hand over and Inauguration ceremony of Phuoc Dong supply water treatment plant"},"content":{"rendered":"<p>(Duong Nhat) On 31st July, 2014, at Phuoc Dong industrial park, the Saigon VRG Investment Holdings Corporation in coordination with DUONG NHAT hosted the handover and inauguration ceremony of the centralized supply water treatment plant for Phuoc Dong industrial park (Station No.2), with a total capacity of 30.000m3\/day and treatment system of 15.000m3\/day. This project be implemented under EPC contract and treated water met to QCVN 01:2009\/BYT, column A.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-1293 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/PhuocDongNuocCap1.jpg\" alt=\"Phuoc Dong Nuoc Cap\" width=\"799\" height=\"449\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/PhuocDongNuocCap1.jpg 799w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/PhuocDongNuocCap1-500x281.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/PhuocDongNuocCap1-768x432.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/PhuocDongNuocCap1-600x337.jpg 600w\" sizes=\"(max-width: 799px) 100vw, 799px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>The WWTP was built on the site of Phuoc Dong \u2013 Boi Loi complex of industrial \u2013 Urban \u2013 Services, Tay Ninh province. After operation, this plant will supply pure water for various factories of industrial park.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Duong Nhat) On 31st July, 2014, at Phuoc Dong industrial park, the Saigon VRG Investment Holdings Corporation in coordination with DUONG NHAT hosted the handover and inauguration ceremony of the centralized supply water treatment plant for Phuoc Dong industrial park (Station No.2), with a total capacity of 30.000m3\/day and treatment system of 15.000m3\/day. This project &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1293,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2874"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2874"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2874\/revisions"}],"predecessor-version":[{"id":2875,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2874\/revisions\/2875"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1293"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2874"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2874"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2874"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}