{"id":2888,"date":"2015-04-03T11:29:51","date_gmt":"2015-04-03T04:29:51","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2888"},"modified":"2019-06-26T11:32:02","modified_gmt":"2019-06-26T04:32:02","slug":"the-contract-signing-ceremony-of-turnkey-project-wastewater-treatment-plant-for-cha-la-industrial-park-capacity-2-000-m3-day","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/the-contract-signing-ceremony-of-turnkey-project-wastewater-treatment-plant-for-cha-la-industrial-park-capacity-2-000-m3-day\/","title":{"rendered":"The contract signing ceremony of Turnkey project: Wastewater treatment plant for Cha La Industrial Park, capacity 2.000 m3\/day"},"content":{"rendered":"<p>(Duong Nhat) On 22nd Nov, 2014, DUONG NHAT and International Investment Division (IID) signed an contract of Turnkey project: Construction of Wastewater treatment plant for Cha La Industrial Park, capacity 2.000 m3\/day, treated wastewater will reach Standard QCVN 40:2011\/BTNMT column A (Kq = 0.9, Kf =1).<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-2159 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/11\/KCNChaLa1.jpg\" alt=\"KCN Cha La\" width=\"1200\" height=\"847\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/11\/KCNChaLa1.jpg 1200w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/11\/KCNChaLa1-500x353.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/11\/KCNChaLa1-768x542.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/11\/KCNChaLa1-1024x723.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>Cha La Industrial Park located in an total area of 200 ha in Cha La Commune, Duong Minh Chau District, Tay Ninh province fields of foods and vegetables processing, mechanical processing and multi-career industrial group.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Duong Nhat) On 22nd Nov, 2014, DUONG NHAT and International Investment Division (IID) signed an contract of Turnkey project: Construction of Wastewater treatment plant for Cha La Industrial Park, capacity 2.000 m3\/day, treated wastewater will reach Standard QCVN 40:2011\/BTNMT column A (Kq = 0.9, Kf =1). &nbsp; &nbsp; Cha La Industrial Park located in an &#8230;<\/p>\n","protected":false},"author":4,"featured_media":2159,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2888"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2888"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2888\/revisions"}],"predecessor-version":[{"id":2889,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2888\/revisions\/2889"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/2159"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2888"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2888"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}