{"id":2892,"date":"2015-04-03T13:40:11","date_gmt":"2015-04-03T06:40:11","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2892"},"modified":"2019-06-26T13:42:00","modified_gmt":"2019-06-26T06:42:00","slug":"commencement-ceremony-of-project-wastewater-treatment-plant-module-1-capacity-2-000-m3-day-of-project-investment-to-constructing-infrastructure-of-nam-tan-uyen-ext","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/commencement-ceremony-of-project-wastewater-treatment-plant-module-1-capacity-2-000-m3-day-of-project-investment-to-constructing-infrastructure-of-nam-tan-uyen-ext\/","title":{"rendered":"Commencement ceremony of project \u201cWastewater treatment plant module 1 \u2013 capacity 2.000 m3\/day\u201d of project \u201cInvestment to constructing infrastructure of Nam Tan Uyen extension industrial park\u201d"},"content":{"rendered":"<p>(Duong Nhat) On the morning of Dec 09th, 2014 at Nam Tan Uyen extension industrial park, DUONG NHAT in coordination with Nam Tan Uyen Joint Stock Corporation held the commencement ceremony for a package \u201cWastewater treatment plant module 1 \u2013 capacity 2.000 m3\/day\u201d of project \u201cInvestment to constructing infrastructure of Nam Tan Uyen extension industrial park\u201d.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-2870 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/NamTanUyen-1.jpg\" alt=\"Nam Tan Uyen\" width=\"797\" height=\"409\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/NamTanUyen-1.jpg 797w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/NamTanUyen-1-500x257.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/NamTanUyen-1-768x394.jpg 768w\" sizes=\"(max-width: 797px) 100vw, 797px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>This project be implemented under turnkey contract with working period of 279 days.Treated wastewater will meet to QCVN 40:2011\/BTNMT, column A (Kq=0,9, Kf=1) before discharged into a receving water.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Duong Nhat) On the morning of Dec 09th, 2014 at Nam Tan Uyen extension industrial park, DUONG NHAT in coordination with Nam Tan Uyen Joint Stock Corporation held the commencement ceremony for a package \u201cWastewater treatment plant module 1 \u2013 capacity 2.000 m3\/day\u201d of project \u201cInvestment to constructing infrastructure of Nam Tan Uyen extension industrial &#8230;<\/p>\n","protected":false},"author":4,"featured_media":2870,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2892"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2892"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2892\/revisions"}],"predecessor-version":[{"id":2893,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2892\/revisions\/2893"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/2870"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}