{"id":2894,"date":"2015-04-03T13:42:42","date_gmt":"2015-04-03T06:42:42","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2894"},"modified":"2019-06-26T14:07:37","modified_gmt":"2019-06-26T07:07:37","slug":"commencement-ceremony-of-project-renovating-and-upgrading-a-textile-dyeing-wastewater-treatment-plant-for-agtex-28-capacity-2-000-m3-day","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/commencement-ceremony-of-project-renovating-and-upgrading-a-textile-dyeing-wastewater-treatment-plant-for-agtex-28-capacity-2-000-m3-day\/","title":{"rendered":"Commencement ceremony of project: \u201cRenovating and upgrading a Textile Dyeing Wastewater treatment plant for Agtex 28, capacity 2.000 m3\/day\u201d"},"content":{"rendered":"<p>(Duong Nhat) The commencement ceremony of project \u201cRenovating and upgrading the Textile Dyeing wastewater treatment plant for 28 Corporation One Member Limited Liability, capacity 2.000m3\/day\u201d was held on the morning of Dec 16th, 2014 at 28 Corporation with participation of representatives of Agtex 28 and DUONG NHAT.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-1316 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/TongCongTy28.jpg\" alt=\"Tong Cong Ty 28\" width=\"700\" height=\"430\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/TongCongTy28.jpg 700w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/TongCongTy28-500x307.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/TongCongTy28-600x369.jpg 600w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>WWTP was implemented under turnkey contracts by DUONG NHAT. The working period of 173 days and treated wastewater will meet to QCVN 13:2008\/BTNMT before discharged to drainage and sewerage system of HCMC and flowed into Vam Thuat River, Go Vap District.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Duong Nhat) The commencement ceremony of project \u201cRenovating and upgrading the Textile Dyeing wastewater treatment plant for 28 Corporation One Member Limited Liability, capacity 2.000m3\/day\u201d was held on the morning of Dec 16th, 2014 at 28 Corporation with participation of representatives of Agtex 28 and DUONG NHAT. &nbsp; &nbsp; WWTP was implemented under turnkey contracts &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1316,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2894"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2894"}],"version-history":[{"count":3,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2894\/revisions"}],"predecessor-version":[{"id":2897,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2894\/revisions\/2897"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1316"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}