{"id":2913,"date":"2015-04-03T14:32:01","date_gmt":"2015-04-03T07:32:01","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2913"},"modified":"2019-06-26T14:35:49","modified_gmt":"2019-06-26T07:35:49","slug":"handover-and-inauguration-ceremony-for-a-project-wastewater-treatment-plant-for-chon-thanh-1-industrial-park-capacity-1-200m3-day","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/handover-and-inauguration-ceremony-for-a-project-wastewater-treatment-plant-for-chon-thanh-1-industrial-park-capacity-1-200m3-day\/","title":{"rendered":"Handover and Inauguration ceremony for a project: Wastewater treatment plant for Chon Thanh 1 Industrial Park, capacity 1.200m3\/day"},"content":{"rendered":"<p>(Duong Nhat) On 5th Feb, 2015, DUONG NHAT held a Handover and Inauguration ceremony for EPC project: WWTP for Chon Thanh 1 Industrial Park, capacity 1.200 m3\/day at Chon Thanh 1 industrial park, Chon Thanh town, Chon Thanh district, Binh Phuoc province, which invested by Chon Thanh Industrial Park Infrastructure Construction Investment One Member Co., Ltd.<\/p>\n<p>&nbsp;<\/p>\n<p>Treated wastewater complied with QCVN 40:2011\/BTNMT, column A before discharged into a receiving water.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-1380 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/KCNChonThanh1.jpg\" alt=\"KCN Chon Thanh\" width=\"1200\" height=\"723\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/KCNChonThanh1.jpg 1200w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/KCNChonThanh1-500x301.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/KCNChonThanh1-768x463.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/06\/KCNChonThanh1-1024x617.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Duong Nhat) On 5th Feb, 2015, DUONG NHAT held a Handover and Inauguration ceremony for EPC project: WWTP for Chon Thanh 1 Industrial Park, capacity 1.200 m3\/day at Chon Thanh 1 industrial park, Chon Thanh town, Chon Thanh district, Binh Phuoc province, which invested by Chon Thanh Industrial Park Infrastructure Construction Investment One Member Co., &#8230;<\/p>\n","protected":false},"author":4,"featured_media":1380,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2913"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2913"}],"version-history":[{"count":2,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2913\/revisions"}],"predecessor-version":[{"id":2915,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2913\/revisions\/2915"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/1380"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2913"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2913"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2913"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}