{"id":2928,"date":"2015-08-12T15:16:56","date_gmt":"2015-08-12T08:16:56","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=2928"},"modified":"2019-06-26T15:19:30","modified_gmt":"2019-06-26T08:19:30","slug":"hand-over-of-wastewater-treatment-plant-of-rubber-processing-factory-of-binh-long-rubber-one-member-co-ltd","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/hand-over-of-wastewater-treatment-plant-of-rubber-processing-factory-of-binh-long-rubber-one-member-co-ltd\/","title":{"rendered":"Hand over of Wastewater treatment plant of Rubber Processing Factory of Binh Long Rubber One Member Co., Ltd"},"content":{"rendered":"<p>On 11th June, 2015, at the 30\/4 Processing Mechanical Enterprise factory \u2013 Binh Long Rubber One Member Co, Ltd, the contractor DUONG NHAT in coordination with Binh Long Rubber One Member Co., Ltd held the Handover and Inauguration ceremony of Turnkey project: Wastewater treatment plant of the Rubber processing factory, capacity: 500 m3\/day.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-2436 aligncenter\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/10\/CaoSuBinhLong1.jpg\" alt=\"Cao Su Binh Long\" width=\"1200\" height=\"674\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/10\/CaoSuBinhLong1.jpg 1200w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/10\/CaoSuBinhLong1-500x281.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/10\/CaoSuBinhLong1-768x431.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2014\/10\/CaoSuBinhLong1-1024x575.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>The WWTP was built on site of the Rubber processing factory of the 30\/4 Processing Mechanical Enterprise factory, Binh Phuoc province.<\/p>\n<p>&nbsp;<\/p>\n<p>After operation, the WWTP will collect and treat wastewater generated from factory operation reach Standard QCVN 01:2008\/BTNMT column A and other items reach QCVN 40:2011\/BTNMT, column A prior to discharge to the sewerage system.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 11th June, 2015, at the 30\/4 Processing Mechanical Enterprise factory \u2013 Binh Long Rubber One Member Co, Ltd, the contractor DUONG NHAT in coordination with Binh Long Rubber One Member Co., Ltd held the Handover and Inauguration ceremony of Turnkey project: Wastewater treatment plant of the Rubber processing factory, capacity: 500 m3\/day. &nbsp; &nbsp; &#8230;<\/p>\n","protected":false},"author":4,"featured_media":2436,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2928"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2928"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2928\/revisions"}],"predecessor-version":[{"id":2929,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/2928\/revisions\/2929"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/2436"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2928"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}