{"id":4582,"date":"2019-11-28T14:12:59","date_gmt":"2019-11-28T07:12:59","guid":{"rendered":"http:\/\/duongnhat.com.vn\/?p=4582"},"modified":"2019-11-28T14:14:56","modified_gmt":"2019-11-28T07:14:56","slug":"commencing-the-project-of-wastewater-treatment-plant-project-and-the-project-of-water-supply-booster-pump-station-for-long-thanh-high-tech-industrial-park","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/commencing-the-project-of-wastewater-treatment-plant-project-and-the-project-of-water-supply-booster-pump-station-for-long-thanh-high-tech-industrial-park\/","title":{"rendered":"COMMENCING THE PROJECT OF WASTEWATER TREATMENT PLANT PROJECT AND THE PROJECT OF WATER SUPPLY BOOSTER PUMP STATION FOR LONG THANH HIGH-TECH INDUSTRIAL PARK"},"content":{"rendered":"<p>On November 06th, 2019, Duong Nhat commenced implementing 02 projects:<\/p>\n<p>&nbsp;<\/p>\n<p>1. Project \u201cThe wastewater treatment plant Phase 1 \u2013 2.950 m3\/12.000 m3\/day \u2013 Long Thanh High-Tech Industrial Park\u201d.<br \/>\n2. Project \u201cThe water supply booster pump station for Long Thanh High Tech Industrial Park Phase 1 \u2013 Capacity of 4000 m3\/16000 m3\/ day\u201d.<\/p>\n<p>&nbsp;<\/p>\n<p>The commence ceremony had the participation of Amata Long Thanh City Joint Stock Company as the Investor and the Asia Apave Company Limited as the consultant company.<\/p>\n<p>&nbsp;<\/p>\n<p>Duong Nhat ensures that these Projects will be completed in accordance with quality, aesthetics and schedule as committed.<\/p>\n<p>&nbsp;<\/p>\n<p>Congratulations on <strong>\u201cDuong Nhat Team\u201d.<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-4447\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/11\/LeKhoiCongAmataLT1.jpg\" alt=\"Le\" width=\"1200\" height=\"803\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/11\/LeKhoiCongAmataLT1.jpg 1200w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/11\/LeKhoiCongAmataLT1-500x335.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/11\/LeKhoiCongAmataLT1-768x514.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/11\/LeKhoiCongAmataLT1-1024x685.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-4449\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/11\/LeKhoiCongAmataLT2.jpg\" alt=\"Le Khoi Cong Amata Long Thanh\" width=\"1200\" height=\"803\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/11\/LeKhoiCongAmataLT2.jpg 1200w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/11\/LeKhoiCongAmataLT2-500x335.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/11\/LeKhoiCongAmataLT2-768x514.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2019\/11\/LeKhoiCongAmataLT2-1024x685.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-4481\" src=\"http:\/\/duongnhat.com.vn\/wp-content\/uploads\/2018\/12\/KcnAmataLongThanhv2.jpg\" alt=\"Kcn Amata Long Thanh\" width=\"1200\" height=\"766\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2018\/12\/KcnAmataLongThanhv2.jpg 1200w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2018\/12\/KcnAmataLongThanhv2-500x319.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2018\/12\/KcnAmataLongThanhv2-768x490.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2018\/12\/KcnAmataLongThanhv2-1024x654.jpg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 \u201cALWAYS CARRY OUT BETTER THAN COMMITMENT\u201d<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On November 06th, 2019, Duong Nhat commenced implementing 02 projects:<br \/>\n1. Project \u201cThe wastewater treatment plant Phase 1 \u2013 2.950 m3\/12.000 m3\/day \u2013 Long Thanh High-Tech Industrial Park\u201d.<br \/>\n2. Project \u201cThe water supply booster pump station for Long Thanh High Tech Industrial Park Phase 1 \u2013 Capacity of 4000 m3\/16000 m3\/ day\u201d.<\/p>\n","protected":false},"author":2,"featured_media":4447,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[114],"tags":[235,203],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/4582"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=4582"}],"version-history":[{"count":3,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/4582\/revisions"}],"predecessor-version":[{"id":4585,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/4582\/revisions\/4585"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/4447"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=4582"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=4582"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=4582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}