{"id":7699,"date":"2023-06-07T11:48:19","date_gmt":"2023-06-07T04:48:19","guid":{"rendered":"https:\/\/duongnhat.com.vn\/?p=7699"},"modified":"2023-06-07T11:48:19","modified_gmt":"2023-06-07T04:48:19","slug":"duong-nhat-completed-the-pouring-batch-of-foundation-concrete-of-1700-m%c2%b3-centralized-wastewater-treatment-plant-of-vsip-iii-industrial-park-binh-duong","status":"publish","type":"post","link":"https:\/\/duongnhat.com.vn\/en\/duong-nhat-completed-the-pouring-batch-of-foundation-concrete-of-1700-m%c2%b3-centralized-wastewater-treatment-plant-of-vsip-iii-industrial-park-binh-duong\/","title":{"rendered":"DUONG NHAT COMPLETED THE POURING BATCH OF FOUNDATION CONCRETE OF 1700 M\u00b3 \u2013 \u201cCENTRALIZED WASTEWATER TREATMENT PLANT OF VSIP III INDUSTRIAL PARK \u2013 BINH DUONG\u201d"},"content":{"rendered":"<p>On the morning of April 19<sup>th<\/sup>, 2023,<strong> Duong Nhat has successfully implemented the pouring batch of foundation concrete at the VSIP III \u2013 Binh Duong Industrial Park Centralized Wastewater Treatment Plant project invested by Vietnam \u2013 Singapore Industrial Park Joint Venture Company Limited (VSIP) with a total volume of more than 1700m<sup>3<\/sup> of concrete.<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-7528\" src=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187869_w.jpg\" alt=\"\" width=\"2560\" height=\"1440\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187869_w.jpg 2560w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187869_w-500x281.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187869_w-768x432.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187869_w-1024x576.jpg 1024w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187869_w-1200x675.jpg 1200w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/> <img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-7526\" src=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187868_w.jpg\" alt=\"\" width=\"2560\" height=\"1440\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187868_w.jpg 2560w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187868_w-500x281.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187868_w-768x432.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187868_w-1024x576.jpg 1024w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187868_w-1200x675.jpg 1200w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>This is the largest batch of concrete pouring of the project, and for this reason, the Project Management Board had a thorough work plan and preparation in advance, ensuring safety during construction.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-7524\" src=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187866_w.jpg\" alt=\"\" width=\"2560\" height=\"1440\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187866_w.jpg 2560w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187866_w-500x281.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187866_w-768x432.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187866_w-1024x576.jpg 1024w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187866_w-1200x675.jpg 1200w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/> <img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-7522\" src=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187864_w.jpg\" alt=\"\" width=\"2560\" height=\"1440\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187864_w.jpg 2560w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187864_w-500x281.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187864_w-768x432.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187864_w-1024x576.jpg 1024w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187864_w-1200x675.jpg 1200w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>For the successful implementation of the pouring batch with a volume of up to 1700 m<sup>3<\/sup> of concrete.\u00a0Duong Nhat has mobilized highly concentrated human resources.\u00a0Under the organization of the company\u2019s Board of Directors, Supervision Consultant and Investor, the pouring batch was completed within 10 hours to ensure quality and on schedule. Duong Nhat set new record for the project!<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-7530\" src=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187870_w.jpg\" alt=\"\" width=\"2560\" height=\"1440\" srcset=\"https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187870_w.jpg 2560w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187870_w-500x281.jpg 500w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187870_w-768x432.jpg 768w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187870_w-1024x576.jpg 1024w, https:\/\/duongnhat.com.vn\/wp-content\/uploads\/2023\/04\/photo_6203981376496187870_w-1200x675.jpg 1200w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>Congratulations to Duong Nhat Team!<\/p>\n<p>We hope that the project will be continuing to implement smoothly and successfully!<\/p>\n<p style=\"text-align: center;\"><strong>DUONG NHAT \u2013 ALWAYS DO BETTER THAN EVERY COMMITMENT.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On the morning of April 19th, 2023, Duong Nhat has successfully implemented the pouring batch of foundation concrete at the VSIP III \u2013 Binh Duong Industrial Park Centralized Wastewater Treatment Plant project invested by Vietnam \u2013 Singapore Industrial Park Joint Venture Company Limited (VSIP) with a total volume of more than 1700m3 of concrete. &nbsp; &#8230;<\/p>\n","protected":false},"author":2,"featured_media":7532,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[114,65],"tags":[591],"_links":{"self":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/7699"}],"collection":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/comments?post=7699"}],"version-history":[{"count":1,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/7699\/revisions"}],"predecessor-version":[{"id":7700,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/posts\/7699\/revisions\/7700"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media\/7532"}],"wp:attachment":[{"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/media?parent=7699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/categories?post=7699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/duongnhat.com.vn\/en\/wp-json\/wp\/v2\/tags?post=7699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}