(Duong Nhat) – On November 10th, 2012 at Gia Dinh People’s hospital, Duong Nhat investment construction and environmental technology Co., ltd and Gia Dinh People Hospital have signed the contract to perform package “construction, supply and installation equipment” belong to new construction collection system and wastewater treatment plant at Gia Dinh People hospital. Capacity is 1.200m3/day. Effluent standards reached QCVN 28:2010/BTNMT value C, column A.
Gia Dinh People’s Hospital is multi-scale science class I, directly under Health Department of Ho Chi Minh city. There are 1.200 beds, the hospital has a large of speciality and is located in residential, the construction for effluent wastewater treatment system must ensure safety and limited maximum pollution levels. Duong Nhat company has researched and applied technology AAO – AEROTANK, this is advanced technology, modern, advantages investment and low operating cost, easy maintenance, the City People’s Committee allow to carry out applying WWTP for hospitals in the city to ensure waste water after treatment reached QCVN 28: value 2010/BTNMT, value C, column A.
DUONG NHAT – “ALWAYS CARRY OUT BETTER THAN COMMITMENT”