Handover Ceremony for Turnkey Project: Wastewater treatment plant for Loc Ninh rubber processing Factory

On 31st December, 2015, Investor Loc Ninh Rubber One Member Co., Ltd (LRC – VRG) and Contractor Duong Nhat Co., had held inauguration and handing over ceremony the WWTP for Loc Ninh rubber processing Factory. Treated wastewater complied with Column A, QCVN 01:2008/BTNMT and QCVN 40:2011/BTNMT (Kq = 0,9, Kf =1) before discharged into a receiving water.

 

CaoSuLocNinh2

 

This project was implemented with Turnkey Project: Planning, Designing, Construction, Supply and Installation, Commissioning and Handover.

 

DUONG NHAT – “ALWAYS CARRY OUT BETTER THAN COMMITMENT”