After a period of construction interruption due to the Covid epidemic, in October 2022, Duong Nhat gathered human resources to Myanmar to implement the project of Wastewater Treatment System of Asia Pacific Breweries (S) Pte Ltd. – Yangon – Myanmar. At the end of 11/2022, Duong Nhat engineers and workers completed the installation of tank clusters and technological piping equipment for the project.
The tanks used in the Wastewater Treatment System of Asia Pacific Breweries (S) Pte Ltd. is a super hard, highly durable tank imported from the USA. The tanks are of high quality, ensuring the stability of the project after putting into operation.
The technological pipeline equipment, equipment, electricity and control are designed and manufactured directly at Duong Nhat’s mechanical factory in Vietnam. Duong Nhat’s team of engineers and experts has designed and manufactured items to ensure standard parameters and safe transportation to Myanmar. As a result, the installation of tank cluster and pipelines, equipment, electricity and control at the construction site takes place quickly, accurately, safely and ensures aesthetics.
We sincerely thank the team of engineers and workers Duong Nhat for their hardworking to complete this project.
DUONG NHAT – “ALWAYS CARRY OUT BETTER THAN COMMITMENT”