Project Name: | Upgrading the Wastewater Treatment Plant for Tetra Pak Carton Packaging Factory (Food & Beverages), Binh Duong |
Capacity: | 120 m3/day |
Effluent Standards: | Tetra Pak Standards |
Owner: | Tetra Pak Binh Duong JSC |
Scope of Work: | EPC |
Project Name: | Upgrading the Wastewater Treatment Plant for Tetra Pak Carton Packaging Factory (Food & Beverages), Binh Duong |
Capacity: | 120 m3/day |
Effluent Standards: | Tetra Pak Standards |
Owner: | Tetra Pak Binh Duong JSC |
Scope of Work: | EPC |