Duong Nhat signed an EPC Contract of project “Wastewater treatment plant for Viet Cuong Canned Food Factory, phase 2” in Long An

Date 26th September, 2015, Duong Nhat signed an EPC package “Wastewater treatment plant for Viet Cuong Canned Food factory, phase 2, capacity 1.000 m3/day”.

 

The project was performed at Nhut Chanh Commune, Ben Luc District, Long An and effluent quality: QCVN 11: 2008/BTNMT.

 

VietCuongCannedFood

 

DUONG NHAT – “ALWAYS CARRY OUT BETTER THAN COMMITMENT”

Bài viết liên quan
Post Related

Leave a Reply