Duong Nhat sucessfully signed an EPC contract of project: Wastewater treatment plant 2, phase 3 (STP 2-Phase 2) at VSIP II Industrial Park in Binh Duong

Date 30th November, 2016, Duong Nhat in coordination with Viet Nam – Singapore Industrial Park K.V., Co., Ltd (VSIP) officially signed the the EPC project “Wastewater treatment plant 2, phase 2 (STP2 – Phase 2) at VSIP II Industrial Parkt in Binh Duong”. The quality of effluent achieves QCVN 40:2011/BTNMT column A.

The project was performed at VSIP II Industrial Park, Binh Duong province.

 

VSipII11

 

DUONG NHAT – “ALWAYS CARRY OUT BETTER THAN COMMITMENT”

Bài viết liên quan
Post Related

Leave a Reply