November 12th , 2013, The handover Ceremony Waster treatment system for Linh Trung 1 Export Processing zone is held between Duong Nhat investment construction án environmental technology company and Sepzone Linh Trung (Viet Nam). Total capacity is 7.000m3/day, capacity of phase 3: 2000m3/day. Achieved outflow is QCVN: 40:2011/BTNMT, column A.
This project was implemented with Turnkey Project: Designing, supplying, equipment installation, execute the construction, operation instruction and hand over technology.
DUONG NHAT – “ALWAYS CARRY OUT BETTER THAN COMMITMENT”